Extended Gable Roof Overhang
Extending a gable roof can be tricky since it involves working on the roof but you may be able to do it yourself if you only need to add 1 2 2 inches 1 3 5 1 cm.
Extended gable roof overhang. How to extend gable end roof overhang. Roof overhangs can extend farther than 2 feet but beyond this length they begin to lose structural integrity and require external supports. My cost of extending a roof overhang. For the arrangement of the gable end overhang for the standard roof you lengthen the ridge beam beyond the facade for previously verified length using cut rafters.
However for larger extensions you ll need to hire a professional to get up there and remove large portions of the roof before extending the overhang. This video will. Then the barge or fly rafter is attached to the end of the cantilevered outlooker. The cost of extending my 30 foot long roof overhang 14 inches was 340 or 11 50 per running foot for materials.
Then a 2 4 outlooker is placed over the dropped gable and butted into the side of the adjacent full height truss. This cost did not include any labor or waste disposal fees. In extreme versions they appear to create the prow of a ship and are thus known also as prow overhangs. This is part two there will be a l.
For gabled roofs the roof rafters extending beyond the wall caps creating an angled roof overhang on the eaves. Two feet is the general maximum length for a typical roof overhang. If a truss roof is used with this method the gable truss is manufactured 3 shorter than the others. A good estimate for a contractor to do this same roof overhang extension would range from 50 to 85 per running foot.
Gable end overhangs also known as rake overhangs extend all the way to the peak of the roof. A rake on the gable end of the roof can be created with the construction of additional roof framing.